Golden Key Venue is an office building in Shanghai, China, created by transforming a former warehouse. Three low-rise blocks are linked to a high-rise zone. A 26 meter cantilever is supported by two tilted columns clad in mirror finish stainless steel. The facade is made of 28,000 red terracotta panels, giving a minimalist campus-like appearance, while ultra-white glass curtain walls form the upper level. Stacked volumes create loft-like interiors. Courtyards, terraces, rooftop gardens and green spaces along Chuanqiao Road connect users with nature.

Questions & Answers

9

1

What is the site area covered by Golden Key Venue Industrial and Office Building?

Answer

Golden Key Venue Industrial and Office Building covers a site area of 11,000 square meters.

2

What is the total building area of Golden Key Venue Industrial and Office Building?

Answer

Golden Key Venue Industrial and Office Building has a total building area of 36,000 square meters.

3

How much of the total building area of Golden Key Venue Industrial and Office Building is located above ground?

Answer

Golden Key Venue Industrial and Office Building has 22,000 square meters of its total building area located above ground.

4

What is the height of Golden Key Venue Industrial and Office Building?

Answer

Golden Key Venue Industrial and Office Building has a height of 40 meters.

5

How many floors above ground are included in Golden Key Venue Industrial and Office Building?

Answer

Golden Key Venue Industrial and Office Building includes 5 floors above ground.

6

How many red terracotta panels are used on the façade of Golden Key Venue Industrial and Office Building?

Answer

Golden Key Venue Industrial and Office Building uses 28,000 red terracotta panels on its facade.

7

Where is Golden Key Venue Industrial and Office Building located?

Answer

Golden Key Venue Industrial and Office Building is located at 1065 Chuanqiao Road, Shanghai, China.

8

When was construction of Golden Key Venue Industrial and Office Building completed?

Answer

Golden Key Venue Industrial and Office Building was completed in 2024.

9

What surface treatment is applied to the mirror-finish stainless steel columns in Golden Key Venue Industrial and Office Building?

Answer

Golden Key Venue Industrial and Office Building applies a mirror finish to its stainless steel columns.

Platinum A' Design Award Winner

Explore the complete story behind Golden Key Venue, an award-winning Architecture, Building and Structure Design by MADA s.p.a.m. LLC.

Discover More

Design Wisdom

Adages