Kwsa
Silver 2025

Kwsa

by Leva Engineering for Leva Engineering

Located within the Aramco Innovation Center in Riyadh, this kinetic wall features a dynamic surface composed of precisely controlled triangular modules. The installation engages visitors through subtle, rhythmic motion and quiet mechanical operation, contributing to the architectural identity of the space. Designed to integrate seamlessly with complementary interactive systems, the kinetic wall enables synchronized choreographies that enrich the visitor experience through unobtrusive technological interaction.

Questions & Answers

12

1

What is the total surface area of Kwsa Kinetic Wall?

Answer

Kwsa Kinetic Wall has a total surface area of 209 square meters.

2

How many modular walls comprise the Kwsa Kinetic Wall installation?

Answer

Kwsa Kinetic Wall comprises six modular walls.

3

What are the width and height of each modular wall in the Kwsa Kinetic Wall configuration?

Answer

Kwsa Kinetic Wall has modular walls each measuring 6000 mm in width and 7000 mm in height.

4

How many stepper motors are integrated into the actuation system of Kwsa Kinetic Wall?

Answer

Kwsa Kinetic Wall integrates 20,000 stepper motors in its actuation system.

5

What level of positional precision does the Kwsa Kinetic Wall motion system achieve?

Answer

Kwsa Kinetic Wall achieves a positional precision of 0.1 mm.

6

What is the motor update rate for the control system of Kwsa Kinetic Wall?

Answer

Kwsa Kinetic Wall has a motor update rate of 20 ms.

7

What material are the moving components of Kwsa Kinetic Wall made from?

Answer

Kwsa Kinetic Wall moving components are made of self-lubricating technopolymers.

8

Which award did Kwsa Kinetic Wall receive in the A' Design Awards in 2025?

Answer

Kwsa Kinetic Wall received the Silver in A' Interactive, Experiential and Immersive Design Installations Award in 2025.

9

What safety certifications or standards does the Kwsa Kinetic Wall comply with?

Answer

Kwsa Kinetic Wall complies with Oil & Gas safety standards.

10

What type of user interface or software is provided to program motion sequences for the Kwsa Kinetic Wall?

Answer

Kwsa Kinetic Wall uses a custom 3D simulation tool that processes grayscale video inputs to program motion sequences.

11

How does the Kwsa Kinetic Wall control software handle synchronization with other interactive installations?

Answer

Kwsa Kinetic Wall control software synchronizes its choreographed movements by timing pre-programmed sequences with other media in the space.

12

How is access to internal electronics achieved for maintenance on the Kwsa Kinetic Wall?

Answer

Kwsa Kinetic Wall provides front access for maintenance of internal electronics.

Silver A' Design Award Winner

Explore the complete story behind Kwsa, an award-winning Installation Design by Leva Engineering.

Discover More

Design Wisdom

Adages