What material defines the facade of the Miryang Election Platform Government Office?
Miryang Election Platform Government Office is defined by a brick tile facade.
How many floors are organized in the Miryang Election Platform Government Office?
Miryang Election Platform Government Office is organized over three floors.
What functions are housed on the first floor of the Miryang Election Platform Government Office?
Miryang Election Platform Government Office houses parking and election material storage on the first floor.
What security feature on the second floor of the Miryang Election Platform Government Office is built with reinforced walls for maximum protection?
Miryang Election Platform Government Office features a highly secured ballot box vault built with reinforced walls for maximum protection on the second floor.
What functions does the third floor of the Miryang Election Platform Government Office support?
Miryang Election Platform Government Office supports election integrity operations on the third floor with a multipurpose meeting room, Fair Election Support Team offices, and investigation rooms.
What architectural element contrasts the rectilinear office mass in the facade of the Miryang Election Platform Government Office?
Miryang Election Platform Government Office features a rounded stair volume that contrasts the rectilinear office mass in its facade.
Which award did the Miryang Election Platform Government Office receive in 2026?
Miryang Election Platform Government Office received the Bronze A' Architecture, Building and Structure Design Award in 2026.
In which country was the Miryang Election Platform Government Office completed?
Miryang Election Platform Government Office was completed in Korea.
What is the total gross floor area of the Miryang Election Platform Government Office?
The total gross floor area of the Miryang Election Platform Government Office is 919.40m².
What parking capacity is provided on the first floor of the Miryang Election Platform Government Office?
The first floor of the Miryang Election Platform Government Office provides parking for 9 vehicles.
What is the thickness and thermal insulation rating of the reinforced walls in the ballot box vault at the Miryang Election Platform Government Office?
The reinforced walls of the ballot box vault are finished with 10 mm thick metal panels.
What HVAC system is used to regulate temperature in the interior spaces of the Miryang Election Platform Government Office?
The interior spaces of the Miryang Election Platform Government Office use an EHP (Electric Heat Pump) heating and cooling system for temperature control.
What accessibility features are included to ensure universal access at the Miryang Election Platform Government Office?
The Miryang Election Platform Government Office is designed to meet the Excellent Grade of BF (Barrier-Free) Certification, ensuring universal accessibility throughout the building.
What daylighting strategy has been applied to the rounded stair volume of the Miryang Election Platform Government Office?
Miryang Election Platform Government Office uses its rounded stair volume to draw daylight into shared interior spaces.
What type of glazing is used in the windows of the Miryang Election Platform Government Office to balance daylight and security?
The windows of the Miryang Election Platform Government Office use 24 mm double-glazed Low-E glass to balance daylight, thermal performance, and security.
What structural system supports the three-floor configuration of the Miryang Election Platform Government Office?
The Miryang Election Platform Government Office uses a reinforced concrete (RC) structural system to support its three-floor configuration.
What type of foundation was selected for the Miryang Election Platform Government Office based on local soil conditions?
Following a geotechnical investigation, the ground was reinforced using the Puzzle Soil ground improvement method, and a mat foundation (raft foundation) was adopted.
What roof membrane and drainage details are specified for the Miryang Election Platform Government Office roof assembly?
The roof assembly uses a concealed polyurethane waterproofing system.
What interior finish materials are used in the multipurpose meeting room on the third floor of the Miryang Election Platform Government Office?
The multipurpose meeting room on the third floor is finished with acoustic panels to improve sound absorption and acoustic performance.
What mechanical ventilation system is installed in the Fair Election Support Team offices of the Miryang Election Platform Government Office?
The Fair Election Support Team offices are equipped with a heat circulation system to support mechanical ventilation and indoor air circulation.